Before a new airliner type carries a single passenger, it's bent, pressurized, shaken, frozen, baked, soaked and flown for months. The rules require the structure to carry 1.5 times the most extreme load expected in service, and manufacturers prove it by bending real wings until they curve upward by metres. Here's what happens, from the test rig to the hangar.
In this article · 10 sections
Flying soon? Our 7-day program walks you through your trip one calm step a day, and you can try a lesson free first. See what's inside.
The short answer
A new airliner type is tested to destruction, or close to it, before anyone books a ticket. Its wings are bent far beyond anything a flight will produce. A whole airframe is put through many lifetimes of simulated flights on the ground. Engines swallow birds, water and ice, and have blades deliberately broken off at full speed. Then test pilots fly the airplane for months in extreme heat and cold, scrape its tail on purpose and slam on the brakes at maximum weight. Only then does it get certified.
The rules: limit loads and the 1.5 safety factor
US certification rules for airliners (14 CFR Part 25) start with two ideas:
- Limit loads are the most extreme loads the airplane is expected to meet in service.
- Ultimate loads are limit loads multiplied by a factor of safety of 1.5.1
At limit load, the structure must not be permanently deformed. At ultimate load, it must hold for at least 3 seconds without failing.2 In other words, an airliner is built to carry half again as much as the worst load anyone expects it to ever see. You can read more about how this feels in flight in is it normal for wings to flex?.
Bending the wings
To prove it, manufacturers build a separate static test airframe and pull on it with hydraulic jacks.
- Boeing 787 (March 2010): Boeing applied loads equal to 150 percent of the most extreme forces the airplane is expected to experience in service. The wings flexed upward by about 25 feet (7.6 metres), during a test lasting more than two hours, with thousands of data points collected every second.3
- Airbus A350 (December 2013): Airbus loaded the wings to 1.5 times the maximum expected loads. The wingtips deflected by more than 5 metres, monitored by more than 10,000 measurement channels.4
The point isn't drama. It's to check that the real structure matches the engineers' predictions, so the numbers used for every other part of the design can be trusted.
Many lifetimes on the ground: fatigue tests
Strength is one thing. Endurance is another. A separate full-scale airframe goes into a rig that repeats the loads of flight after flight: pressurizing, taxiing, taking off, cruising and landing, over and over.
The rules require structure to be evaluated for fatigue and damage tolerance, and manufacturers must set a limit of validity: a number of flight cycles or hours during which it has been shown that widespread fatigue damage won't occur, demonstrated by full-scale fatigue test evidence.5 (A type certificate can be issued before the fatigue test is finished, under an approved plan to complete it.)5 Boeing described its 787 fatigue test as simulating up to three times the number of flight cycles an airplane is likely to see in a lifetime of service.6 Airbus says the A350's certification tests covered the equivalent of three times the design lifetime.7
Birds, blades and lightning
- Bird strikes. Engine makers fire birds (or approved substitutes) into running engines at takeoff power. For the largest bird, the test is at 200 knots, and the throttle may not be moved for 15 seconds afterwards. The engine must not catch fire, break apart dangerously or become impossible to shut down.8 The airframe is designed for strikes too: the tail must withstand an 8-pound bird at cruise speed at sea level,9 and the airplane must be able to complete a flight after structural damage from a 4-pound bird.5 More in bird strikes.
- Fan-blade-out. Engine makers deliberately release the most critical fan blade at maximum permitted speed. The engine must contain the damage without catching fire or tearing from its mounts for at least 15 seconds.10 See also what happens if an engine fails.
- Lightning. The airplane must be protected against catastrophic effects from lightning,11 which manufacturers show by test and analysis. More in lightning and planes.
Heat, cold, water and hail
- Weather extremes. For the A350, Airbus flew cold-weather trials in Iqaluit, Canada, high-altitude tests in La Paz, Bolivia, and a hot-weather campaign in Al Ain, UAE. The airplane also spent time in the McKinley Climatic Laboratory in Florida, which can produce temperatures from +40°C to −40°C inside a hangar.7
- Rain and hail. Engines must handle large hailstones, including 2-inch stones for big inlets, and keep running through standard concentrations of rain and hail.12
- Water on the runway. Air intakes must be shown to work with water or slush thrown up on the runway,13 and Airbus lists water-ingestion trials, for runways with a lot of standing water, among its certification flight tests.7
Scraping the tail and stopping hard
- Minimum unstick. Test pilots find the slowest speed at which the airplane can safely lift off, called VMU.14 To find it, they raise the nose until the tail touches the runway, usually with a protective skid fitted. Normal takeoff speeds are then set with a margin above it: at least 110% of VMU with all engines running.14
- Rejected takeoff. The wheels, brakes and tires must be proven on a dynamometer to absorb the energy of a rejected takeoff at the most critical weight and speed, across the full wear range of the brake.15 Manufacturers also run rejected takeoffs on a real runway during flight testing.7
Months of flight testing
Then the airplane flies. Airbus describes campaigns covering handling, performance, failure cases, flutter and wake vortex. For the A350-900, five aircraft flew more than 2,600 hours in just over 14 months before certification by EASA and the FAA.7
And once it's in service
Certification is the start, not the end. Airlines organize thousands of individual maintenance tasks into scheduled work packages.16 In the industry these are often called letter checks: lighter A checks done frequently, and much deeper C and D checks where large parts of the airplane are opened up and inspected. The names and intervals vary by airline and aircraft type. See how often are planes inspected?.
The calm takeaway: the wings you're looking out at belong to a design that has been bent far beyond anything a flight will put on them, flown through years of simulated flights, and tested in heat, cold, water and lightning. Bumps feel big from inside. To the airplane, they're well within what it was built and proven to handle.
Keep reading
- Is it normal for airplane wings to flex and bounce?
- How often are planes inspected?
- Everything pilots do to become airline pilots
- On board? See how many airplane parts you can spot in the cabin scavenger hunt, or try the grounding exercise.
- For a full week of preparation, try 7 days to your flight; the in-flight pack works offline once you've opened it, and the free newsletter sends calm explainers.
Quick answers
How much stronger is an airliner than it needs to be?
US rules require the structure to carry ultimate loads, which are the most extreme loads expected in service (limit loads) multiplied by a factor of safety of 1.5, for at least 3 seconds without failing. Manufacturers prove this with full-scale tests.
How far do airplane wings bend in testing?
In Boeing's 787 ultimate-load test in 2010, the wings flexed upward by about 25 feet (7.6 metres). In Airbus's A350 test in December 2013, the wingtips deflected more than 5 metres. Both tests applied 1.5 times the most extreme expected loads.
Do they really fire birds at airplane engines?
Yes, as part of engine certification. US rules require tests with birds, or approved substitutes, fired into a running engine at takeoff power. For the largest bird the test is at 200 knots, and the engine must not catch fire, break apart dangerously or become impossible to shut down.
What is an A, C or D check?
These are industry names for scheduled maintenance work packages, from lighter, frequent checks to deep heavy checks where much of the airplane is opened up and inspected. The names and intervals vary by airline and aircraft type, and each airline's program is approved by its regulator.
Sources
(16)
- 14 CFR § 25.303, Factor of safety
- 14 CFR § 25.305, Strength and deformation
- Boeing, "Boeing Completes Ultimate-Load Wing Test on 787" (March 28, 2010)
- Aviation Week, "A350 XWB passes ultimate load wing test" (Airbus announcement, January 2014)
- 14 CFR § 25.571, Damage-tolerance and fatigue evaluation of structure
- Boeing, "Boeing Begins Testing on 787 Dreamliner Fatigue Airframe" (September 13, 2010)
- Airbus, Test and certification
- 14 CFR § 33.76, Bird ingestion
- 14 CFR § 25.631, Bird strike damage
- 14 CFR § 33.94, Blade containment and rotor unbalance tests
- 14 CFR § 25.581, Lightning protection
- 14 CFR § 33.78, Rain and hail ingestion
- 14 CFR § 25.1091, Air intake
- 14 CFR § 25.107, Takeoff speeds
- 14 CFR § 25.735, Brakes and braking systems
- FAA Advisory Circular 120-16G, Air Carrier Maintenance Programs
Facts last checked against these sources: October 28, 2026.